City Creek Center Block 74 Parking Structure

Wadsworth Brothers Construction selected Hunt Electric in the design phase of the project as the design-build contractor. The scope of work included the demolition of the existing six-story building and reconstruction of the new 11-story parking structure. The project was designed with an all exposed conduit system that included lighting, security raceway, generator backup and fire alarm. The design also included the electrical system for two elevators.


RELEVANT EXPERIENCE

EIGHT IN-HOUSE DIVISIONS

A SINGLE POINT OF ACCOUNTABILITY


Since 1986, Hunt Electric has earned a strong reputation for delivering industry-leading services across all markets in the Intermountain West. With eight specialized in-house divisions, we offer comprehensive solutions under one roof, providing clients with seamless coordination and a single point of accountability on every project.